iFieldPro Logo
About

Methodology & Quality

One integrated data collection system across every methodology and study format.

Methodology & Quality
How we run fieldwork

The project lifecycle from brief to validated data

Project lifecycle summary: pre-launch planning, pre-launch activities, launch, and data validation stages.
Project lifecycle summary
01

Field planning – pre-launch plan

11 systematic planning steps

  • Read the field brief note and questionnaire
  • Seek clarifications from the research team
  • Open the project folder
  • Review the questionnaire, cards and stimulus
  • Plan productivity targets
  • Calculate manpower requirements
  • Agree the quality check plan
  • Schedule material preparation
  • Schedule the briefing
  • Schedule fieldwork
  • Agree the data sync plan
02

Fieldwork planning – pre-launch activities

10 operational setup steps

  • Assign the project lead (field executive or above) for each survey location, plus the field supervisor
  • Prepare the briefing checklist with the field executive
  • Prepare the field budget with the field executive
  • Clarify every instruction on the questionnaire
  • Supervise material preparation
  • Supervise the Arabic translation
  • Supervise sampling and area selection
  • Supervise quota preparation
  • Supervise interviewer selection
  • Supervise supervisor and part-time staff selection
03

Briefing and trial protocols

Interviewer readiness and compliance

  • All interviewers briefed in person by Field Managers; supervisors and back-checkers briefed by Project Executive
  • Separate briefings for each phase of projects with trial pilot interviews conducted individually under supervision
  • All agreements documented and shared for consistency; signed Confidentiality Agreement required before fieldwork starts
  • New interviewers conduct at least two trial interviews before they are allotted quotas
04

Fieldwork launch and monitoring

Execution and continuous quality checks

  • Daily quota tracking, scheduled accompaniment, and live reporting to PM and client services
  • Data validation outlier checks (LOI, odd hours, duplicate GPS, straight-lining, and silent listening)
  • Customised back-check (30%) by independent validation auditors
  • Real-time issue management and risky interviewer identification
05

Data validation and quality reporting

100% verification and close-out

  • 100% data checking and cross-project duplicate checks
  • Summary call-back reporting and RAG project status reports
  • Comprehensive field completion report and quality index reporting
  • Zero tolerance policy enforcement for substandard quality
Fieldwork Techniques

Data collection methodologies

One integrated data collection system across every methodology and study format.

Digital modes

  • CAPI (B2C / B2B)
  • CAWI
  • CATI
  • CAVI
  • CASI

Quantitative

  • Surveys
  • CLT
  • Exit interviews
  • Product placement (HUT)
  • Mystery shopping

Qualitative

  • IDIs (online and offline)
  • FGDs (online and offline)
  • Online communities
  • Ethnography and home visits
  • Shop-along

Special setups

  • Product testing with bespoke setups
  • Car clinics
Quality control and assurance

Five commitments on every project

01

Share the field plan and adhere to it

02

Fast, on-time response

03

On-time updates in agreed formats

04

Avoid last-minute changes to deadlines

05

A quality control report for each project